Home
Images
Vectors
Videos
Stock image Chinese technicians check the transformer substation for China's largest and most complicated 500 kV ultra-high voltage power line in Zhoushan city, east China's Zhejiang province, 15 January 2019
Published:
Mar.18, 2019 11:56:38
Author:
ChinaImages
Views:
7
Downloads:
1
File type:
image
/
jpg
File size:
3.28 MB
Orginal size:
3000
x
2000
px
Available sizes:
S
(500 x 333)
M
(1000 x 667)
L
(2000 x 1333)
XL
(3000 x 2000)
EL0
(3000 x 2000)
Level:
platinum
Download Image
Image topics:
Power
Voltage
Line
City
Chinese
East
China
January
Transformer
Check
Largest
Transmission
Province
Substation
15
Most
Complicated
Technicians
2019
Zhejiang
KV
Ultra High
Chinas
Zhoushan
500
Similar stock images
Chinese Technicians Check The Transformer Substation For China's Largest And Most Complicated 500 KV Ultra-high Voltage Power Line In Zhoushan City, East China's Zhejiang Province, 15 January 2019
3000 × 2000
Chinese Technicians Check The Transformer Substation For China's Largest And Most Complicated 500 KV Ultra-high Voltage Power Line In Zhoushan City, East China's Zhejiang Province, 15 January 2019
3000 × 2000
Workers Are Seen At The Construction Site Of The Giant Radio Telescope At The Foot Of Sheshan Hill In Shanghai, China, 17 April 2012
4256 × 2832
A Chinese Worker Maintains The Power Lines At The 110KV Dongyang Substation In Chuzhou, East Chinas Anhui Province, 15 April 2013
4544 × 3024
Chinese Workers Maintain The Power Lines At The 110KV Dongyang Substation In Chuzhou, East Chinas Anhui Province, 15 April 2013.
3216 × 2136
Large Electric Transformers
5622 × 3748
Chinese Workers Maintain The Power Lines At The 110KV Dongyang Substation In Chuzhou, East Chinas Anhui Province, 15 April 2013.
3600 × 2396
Chinese Workers Assemble Power Cables To Connect Zhoushan's Jintang And Cezi Islands With A Distance Of 2,656 Metres At The 380-metre Tall Electricity Pylon, Which Is The Tallest Power Transmission Tower In The World, In Jintang Island, Zhoushan City
3000 × 2000