Home
Images
Vectors
Videos
Stock image Chinese workers maintain the power lines at the 110KV Yidu Substation in Qingzhou, east Chinas Shandong province, 12 April 2013.
Published:
Apr.22, 2019 12:32:44
Author:
ChinaImages
Views:
16
Downloads:
1
File type:
image
/
jpg
File size:
0.87 MB
Orginal size:
3974
x
2645
px
Available sizes:
S
(500 x 333)
M
(1000 x 666)
L
(2000 x 1331)
XL
(3974 x 2645)
EL0
(3974 x 2645)
Level:
platinum
Download Image
Image topics:
Equipment
People
Plant
Male
Cable
Electric
Electricity
Industrial
Power
Technology
Machine
Men
Building
City
Construction
Industry
Urban
Lines
Working
Work
Safety
Economy
Chinese
East
Production
China
Engineering
Station
Workers
Helmets
Maintain
Factory
12
Province
Substation
Engineers
Shandong
110kv
Similar stock images
Chinese Workers Maintain The Power Lines At The 110KV Yidu Substation In Qingzhou, East Chinas Shandong Province, 12 April 2013.
3502 × 2330
Chinese Workers Maintain The Power Lines At The 110KV Dongyang Substation In Chuzhou, East Chinas Anhui Province, 15 April 2013.
4544 × 3024
Chinese Electricians Upgrade Electrical Equipment In Maanshan City, East Chinas Anhui Province, 26 May 2011
3073 × 2048
Chinese Electricians Check The Temperature Of Electrical Device At A 220kv Transformer Station In Jiujiang City, East Chinas Jiangxi Province, 26 July 2011
3748 × 2592
Chinese Workers Maintain The Power Lines At The 110KV Dongyang Substation In Chuzhou, East Chinas Anhui Province, 15 April 2013.
4200 × 2795
A Chinese Worker Is Seen Working At A Substation In Chuzhou City, East Chinas Anhui Province, October 9, 2010
3024 × 2016
A Chinese Worker Maintains The Power Lines At The 110KV Dongyang Substation In Chuzhou, East Chinas Anhui Province, 15 April 2013
4544 × 3024
Workers Repairing A Transformer At The Power Station.
3500 × 2329