photo free
Home Images Vectors Videos

Stock image IPOH, MALAYSIA -MARCH 03, 2020: Bore pile materials made from strong precast concrete designed by the engineers. It will be driven into the soil as the foundation and will be tied by pile caps.

Stock image IPOH, MALAYSIA -MARCH 03, 2020:  Bore pile materials made from strong precast concrete designed by the engineers. It will be driven into the soil as the foundation and will be tied by pile caps.
Published: Jan.26, 2021 08:25:07
Author: Aisyaqilumar
Views: 3
Downloads: 1
File type: image / jpg
File size: 12.42 MB
Orginal size: 4566 x 3425 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4566 x 3425)
EL0
(4566 x 3425)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image SELANGOR, MALAYSIA -JANUARY 22, 2021: Underground precast concrete box culvert drain under construction at the construction site. It is used to channel stormwater to prevent flash floods.

SELANGOR, MALAYSIA -JANUARY 22, 2021: Underground Precast Concrete Box Culvert Drain Under Construction At The Construction Site. It Is Used To Channel Stormwater To Prevent Flash Floods.

4141 × 3105
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 6, 2019: Pile cap and column stump under construction at the construction site. Constructed using reinforced concrete with plywood timber as a form work.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 6, 2019: Pile Cap And Column Stump Under Construction At The Construction Site. Constructed Using Reinforced Concrete With Plywood Timber As A Form Work.

3894 × 2920
stock image SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

3740 × 2908
stock image Construction workers installing pile cap formwork

Construction Workers Installing Pile Cap Formwork

3872 × 2592
stock image SELANGOR, MALAYSIA -JANUARY 20, 2021: Concrete box culvert drain under construction at the construction site. It is used to channel stormwater to prevent flash floods.

SELANGOR, MALAYSIA -JANUARY 20, 2021: Concrete Box Culvert Drain Under Construction At The Construction Site. It Is Used To Channel Stormwater To Prevent Flash Floods.

4392 × 3360
stock image IPOH, MALAYSIA -MARCH 03, 2020:  Bore pile materials made from strong precast concrete designed by the engineers. It will be driven into the soil as the foundation and will be tied by pile caps.

IPOH, MALAYSIA -MARCH 03, 2020: Bore Pile Materials Made From Strong Precast Concrete Designed By The Engineers. It Will Be Driven Into The Soil As The Foundation And Will Be Tied By Pile Caps.

4592 × 3448
stock image SELANGOR, MALAYSIA -DECEMBER 02, 2016: Construction workers laying precast concrete drain at the construction site.

SELANGOR, MALAYSIA -DECEMBER 02, 2016: Construction Workers Laying Precast Concrete Drain At The Construction Site.

3264 × 2064
stock image JOHOR, MALAYSIA - SEPTEMBER 03, 2020: Bore pile that has been driven into the ground and reached the required depth. It will be cut and then a pile cap will be built over it.

JOHOR, MALAYSIA - SEPTEMBER 03, 2020: Bore Pile That Has Been Driven Into The Ground And Reached The Required Depth. It Will Be Cut And Then A Pile Cap Will Be Built Over It.

3933 × 2950