photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -APRIL 06, 2017: Construction site workers are doing ceiling soffit skim coat work at the construction site. Two layers base and final coat apply to get the smooth surface.

Stock image KUALA LUMPUR, MALAYSIA -APRIL 06, 2017: Construction site workers are doing ceiling soffit skim coat work at the construction site. Two layers base and final coat apply to get the smooth surface.
Published: Aug.13, 2018 07:05:06
Author: Aisyaqilumar
Views: 20
Downloads: 4
File type: image / jpg
File size: 7.21 MB
Orginal size: 3872 x 2592 px
Available sizes:
S
(500 x 335)
M
(1000 x 669)
L
(2000 x 1339)
XL
(3872 x 2592)
EL0
(3872 x 2592)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image SELANGOR, MALAYSIA -SEPTEMBER 06, 2016: Site workers are doing soffit skim coat work at the construction site.

SELANGOR, MALAYSIA -SEPTEMBER 06, 2016: Site Workers Are Doing Soffit Skim Coat Work At The Construction Site.

3648 × 2442
stock image Site workers are doing soffit skim coat work

Site Workers Are Doing Soffit Skim Coat Work

4918 × 3688
stock image KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction site workers are doing ceiling soffit skim coat work at the construction site. Two layers base and final coat apply to get the smooth surface.

KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction Site Workers Are Doing Ceiling Soffit Skim Coat Work At The Construction Site. Two Layers Base And Final Coat Apply To Get The Smooth Surface.

4310 × 3237
stock image KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction site workers are doing ceiling soffit skim coat work at the construction site. Two layers base and final coat apply to get the smooth surface.

KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction Site Workers Are Doing Ceiling Soffit Skim Coat Work At The Construction Site. Two Layers Base And Final Coat Apply To Get The Smooth Surface.

4492 × 3373
stock image KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction site workers are doing ceiling soffit skim coat work at the construction site. Two layers base and final coat apply to get the smooth surface.

KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction Site Workers Are Doing Ceiling Soffit Skim Coat Work At The Construction Site. Two Layers Base And Final Coat Apply To Get The Smooth Surface.

4592 × 3448
stock image SELANGOR, MALAYSIA -SEPTEMBER 03, 2016: Site workers are doing soffit skim coat work at the construction site.

SELANGOR, MALAYSIA -SEPTEMBER 03, 2016: Site Workers Are Doing Soffit Skim Coat Work At The Construction Site.

3565 × 2387
stock image KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction site workers are doing ceiling soffit skim coat work at the construction site. Two layers base and final coat apply to get the smooth surface.

KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction Site Workers Are Doing Ceiling Soffit Skim Coat Work At The Construction Site. Two Layers Base And Final Coat Apply To Get The Smooth Surface.

4592 × 3448
stock image SELANGOR, MALAYSIA -SEPTEMBER 06, 2016: Site workers are doing soffit skim coat work at the construction site.

SELANGOR, MALAYSIA -SEPTEMBER 06, 2016: Site Workers Are Doing Soffit Skim Coat Work At The Construction Site.

4896 × 3624