Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -APRIL 12, 2018: Drywall installation work in progress by construction workers at the construction site. It is the easiest and cheapest way to do partition for an interior wall.
Published:
Aug.06, 2018 08:23:37
Author:
Aisyaqilumar
Views:
36
Downloads:
2
File type:
image
/
jpg
File size:
8.96 MB
Orginal size:
4896
x
3672
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4896 x 3672)
EL0
(4896 x 3672)
Level:
bronze
Download Image
Image topics:
Design
Set
Decoration
Metal
Board
Frame
Finishing
Architecture
Building
Construction
House
Wall
Interior
Indoor
Home
Measurement
Work
Tool
Room
Material
Repair
Site
Wool
Apartment
Worker
Improvement
Screwdriver
Installing
Cheap
Renovation
Plaster
Ceiling
Contractor
Gypsum
Installation
Renovate
Progress
Easy
Internal
Assemble
Compound
Stud
Partition
Thermal
Fixing
Install
Insulation
Suspended
Drywall
Plasterboard
Similar stock images
KUALA LUMPUR, MALAYSIA -APRIL 12, 2018: Drywall Installation Work In Progress By Construction Workers At The Construction Site. It Is The Easiest And Cheapest Way To Do Partition For The Interior Wall.
4717 × 3538
KUALA LUMPUR, MALAYSIA -APRIL 12, 2018: Drywall Installation Work In Progress By Construction Workers At The Construction Site. It Is The Easiest And Cheapest Way To Do Partition For An Interior Wall.
4661 × 3496
KUALA LUMPUR, MALAYSIA -MAY 15, 2018: Electrical Conduit, Cable Tray And Air-cond Pipes As Part Of Services Above Ceiling Installed At The Construction.
4495 × 3371
KUALA LUMPUR, MALAYSIA -APRIL 12, 2018: Drywall Installation Work In Progress By Construction Workers At The Construction Site. It Is The Easiest And Cheapest Way To Do Partition For The Interior Wall.
3921 × 2940
KUALA LUMPUR, MALAYSIA -APRIL 16, 2020: Construction Site Workers Are Doing Ceiling Soffit Skim Coat Work At The Construction Site. Two Layers Base And Final Coat Apply To Get The Smooth Surface.
4285 × 3218
Group Of Workers Who Assemble Scaffolding In Their Workspace.
2450 × 1645
KUALA LUMPUR, MALAYSIA -APRIL 06, 2017: Construction Site Workers Are Doing Ceiling Soffit Skim Coat Work At The Construction Site. Two Layers Base And Final Coat Apply To Get The Smooth Surface.
4974 × 3730
Construction Workers Working At Height At The Construction Site.
4307 × 2657