Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -AUGUST 26, 2017: Concrete column under construction with protruded steel reinforcement bar at the top. Ready to continue casting for the next level.
Published:
Oct.31, 2022 10:08:36
Author:
Aisyaqilumar
Views:
1
Downloads:
0
File type:
image
/
jpg
File size:
9.08 MB
Orginal size:
4299
x
3225
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4299 x 3225)
EL0
(4299 x 3225)
Level:
bronze
Download Image
Image topics:
Bar
Design
High
Metal
Outdoor
Vertical
Steel
Industrial
Frame
Road
Architecture
Construction
Exterior
Industry
Structure
Tall
Wall
Strong
Development
Work
Pole
Grey
Cement
Build
Top
Under
Engineering
Site
Tie
Infrastructure
Concrete
Level
Worker
Load
Column
Reinforcement
Bare
Rod
Pillar
Finish
Next
Distribute
Casting
Continue
Install
Unfinished
Fabricate
Reinforced
Rebar
Protruded
Similar stock images
KUALA LUMPUR, MALAYSIA -JUNE 1, 2018: Reinforcement Concrete Column As Part Of Building Structure At The Construction Site. Reinforcement Bar On Top Of Column Ready For Next Stage Of Construction.
4810 × 3607
KUALA LUMPUR, MALAYSIA -JUNE 1, 2018: Reinforcement Concrete Column As Part Of Building Structure At The Construction Site. Reinforcement Bar On Top Of Column Ready For Next Stage Of Construction.
4675 × 3506
KUALA LUMPUR, MALAYSIA -JULY 25, 2017: Precast System Aluminum Formwork Used At The Construction Site As The Reusable Concrete Form-work. It Is Of High Durability And Can Be Used Repeatedly. Saving Time
4791 × 3593
KUALA LUMPUR, MALAYSIA -JULY 25, 2017: Precast System Aluminum Formwork Used At The Construction Site As The Reusable Concrete Form-work. It Is High Durability And Can Be Used Repeatedly. Saving Time
4791 × 3593
KUALA LUMPUR, MALAYSIA - SEPTEMBER 15, 2016: Building Foundation Work At Construction Site. Work Below The Surface Is The Construction Ongoing Work
4644 × 3483
SELANGOR, MALAYSIA -JULY 17, 2021: Concrete Columns Are Formed Using Timber And Plywood Formwork. Steel Reinforcement Is Neatly Installed Inside Before Being Poured With Molten Concrete.
3517 × 2638
KUALA LUMPUR, MALAYSIA -AUGUST 26, 2017: Concrete Column Under Construction With Protruded Steel Reinforcement Bar At The Top. Ready To Continue Casting For The Next Level.
4700 × 3525
KUALA LUMPUR, MALAYSIA -MARCH 5, 2020:The Construction Site Is Operating During The Day. Workers Are Busy Carrying Out Their Activities As Planned Under The Supervisor's Supervision.
3734 × 2499