photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -JULY 31, 2018: Bore pile cut to level by the construction workers. It will continue by pile cap and ground beam works.

Stock image KUALA LUMPUR, MALAYSIA -JULY 31, 2018: Bore pile cut to level by the construction workers. It will continue by pile cap and ground beam works.
Published: Aug.06, 2018 08:24:11
Author: Aisyaqilumar
Views: 4
Downloads: 0
File type: image / jpg
File size: 2.72 MB
Orginal size: 2592 x 1944 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(2592 x 1944)
EL0
(2592 x 1944)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image SEREMBAN, MALAYSIA -AUGUST 5, 2020: Utility services manhole and underground pipes under construction at the construction site. In-situ construction by workers based on infrastructure engineer design.

SEREMBAN, MALAYSIA -AUGUST 5, 2020: Utility Services Manhole And Underground Pipes Under Construction At The Construction Site. In-situ Construction By Workers Based On Infrastructure Engineer Design.

3619 × 2714
stock image SEREMBAN, MALAYSIA -MARCH 05, 2021:  Construction workers cutting concrete bore pile up to the determined level at the construction site. Stage fo work before fabricating the pile cap.

SEREMBAN, MALAYSIA -MARCH 05, 2021: Construction Workers Cutting Concrete Bore Pile Up To The Determined Level At The Construction Site. Stage Fo Work Before Fabricating The Pile Cap.

4000 × 3000
stock image Steel rod  used to reinforce concrete

Steel Rod Used To Reinforce Concrete

3648 × 5216
stock image Pile cap form work and excavated pile

Pile Cap Form Work And Excavated Pile

3040 × 2200
stock image Pile cap form work with reinforcement bar in it

Pile Cap Form Work With Reinforcement Bar In It

3264 × 2448
stock image Pile cap form work with reinforcement bar in it

Pile Cap Form Work With Reinforcement Bar In It

3264 × 2448
stock image KUALA LUMPUR, MALAYSIA -JUNE15, 2018: Reinforce concrete bore pile at the construction site. Cut to level to continue with pile cap and ground beam works. Transferring load from building to earth.

KUALA LUMPUR, MALAYSIA -JUNE15, 2018: Reinforce Concrete Bore Pile At The Construction Site. Cut To Level To Continue With Pile Cap And Ground Beam Works. Transferring Load From Building To Earth.

3876 × 2907
stock image SELANGOR, MALAYSIA -MAY 2, 2022: Building foundation work is being carried out at the construction site. The building uses the bore pile and pile cap method. Workers are busy at the construction site.

SELANGOR, MALAYSIA -MAY 2, 2022: Building Foundation Work Is Being Carried Out At The Construction Site. The Building Uses The Bore Pile And Pile Cap Method. Workers Are Busy At The Construction Site.

5152 × 3204