photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of stop cork valve and joint in progress.

Stock image KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of stop cork valve and joint in progress.
Published: May.30, 2018 11:29:01
Author: Aisyaqilumar
Views: 10
Downloads: 2
File type: image / jpg
File size: 5.35 MB
Orginal size: 2879 x 2159 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(2879 x 2159)
EL0
(2879 x 2159)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of stop cork valve and joint in progress.

KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Stop Cork Valve And Joint In Progress.

3264 × 2448
stock image SEREMBAN, MALAYSIA -MARCH 05, 2021:  Construction workers cutting concrete bore pile up to the determined level at the construction site. Stage fo work before fabricating the pile cap.

SEREMBAN, MALAYSIA -MARCH 05, 2021: Construction Workers Cutting Concrete Bore Pile Up To The Determined Level At The Construction Site. Stage Fo Work Before Fabricating The Pile Cap.

3460 × 2595
stock image SEREMBAN, MALAYSIA -FEBRUARY 24, 2017: Underground utility and services pipe lay by workers at the construction site.

SEREMBAN, MALAYSIA -FEBRUARY 24, 2017: Underground Utility And Services Pipe Lay By Workers At The Construction Site.

2906 × 2179
stock image SELANGOR, MALAYSIA MARCH 15, 2016: Sheet pile cofferdam driven machine at the construction site. The machine drove the sheet pile to the earth using vibrated hydraulic arm. Workers control.

SELANGOR, MALAYSIA MARCH 15, 2016: Sheet Pile Cofferdam Driven Machine At The Construction Site. The Machine Drove The Sheet Pile To The Earth Using Vibrated Hydraulic Arm. Workers Control.

2844 × 3835
stock image PENANG, MALAYSIA -SEPTEMBER 2, 2021: The process of cutting piles after the completion of building foundation piling work. This work needs to be done before the construction of the cap pile is carried out.

PENANG, MALAYSIA -SEPTEMBER 2, 2021: The Process Of Cutting Piles After The Completion Of Building Foundation Piling Work. This Work Needs To Be Done Before The Construction Of The Cap Pile Is Carried Out.

4187 × 3140
stock image KUALA LUMPUR, MALAYSIA -APRIL 07, 2017: Earthworks at the construction site by construction heavy machinery to get the required platform level. Works carried out before building construction starts.

KUALA LUMPUR, MALAYSIA -APRIL 07, 2017: Earthworks At The Construction Site By Construction Heavy Machinery To Get The Required Platform Level. Works Carried Out Before Building Construction Starts.

5152 × 3864
stock image KUALA LUMPUR, MALAYSIA - SEPTEMBER 15, 2016: Building foundation work at construction site. Bore pile and pile cap construction on going work

KUALA LUMPUR, MALAYSIA - SEPTEMBER 15, 2016: Building Foundation Work At Construction Site. Bore Pile And Pile Cap Construction On Going Work

4208 × 3120
stock image SEREMBAN, MALAYSIA -FEBRUARY 24, 2017: Underground utility and services pipe lay by workers at the construction site.

SEREMBAN, MALAYSIA -FEBRUARY 24, 2017: Underground Utility And Services Pipe Lay By Workers At The Construction Site.

3082 × 2311