photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -JUNE 4, 2018: Sewerage manhole and pipes line under construction at the construction site. The pipes located inside excavated deep trenches.

Stock image KUALA LUMPUR, MALAYSIA -JUNE 4, 2018: Sewerage manhole and pipes line under construction at the construction site. The pipes located inside excavated deep trenches.
Published: Jul.02, 2018 13:39:28
Author: Aisyaqilumar
Views: 55
Downloads: 1
File type: image / jpg
File size: 9.29 MB
Orginal size: 2922 x 3895 px
Available sizes:
S
(375 x 500)
M
(750 x 1000)
L
(1500 x 2000)
XL
(2922 x 3895)
EL0
(2922 x 3895)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image KUALA LUMPUR, MALAYSIA -JUNE 4, 2018: Sewerage manhole and pipes line under construction at the construction site. The pipes located inside excavated deep trenches.

KUALA LUMPUR, MALAYSIA -JUNE 4, 2018: Sewerage Manhole And Pipes Line Under Construction At The Construction Site. The Pipes Located Inside Excavated Deep Trenches.

2579 × 3438
stock image SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

2250 × 3418
stock image The high voltage electrical cable is laid in a trench.

The High Voltage Electrical Cable Is Laid In A Trench.

3000 × 2250
stock image a heating pipes on the building site

A Heating Pipes On The Building Site

2976 × 3968
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

4842 × 3632
stock image KUALA LUMPUR, MALAYSIA -JULY 14, 2018: Workers repairing underground utility and services pipe in the shallow trenches at the construction site. Repairing work done manually.

KUALA LUMPUR, MALAYSIA -JULY 14, 2018: Workers Repairing Underground Utility And Services Pipe In The Shallow Trenches At The Construction Site. Repairing Work Done Manually.

4896 × 3672
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

4392 × 3294
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

4654 × 3491