photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -MARCH 01, 2020: Trenches excavated at the construction site by construction workers to accommodate the utility services. Sizes depend on the engineers design.

Stock image KUALA LUMPUR, MALAYSIA -MARCH 01, 2020: Trenches excavated at the construction site by construction workers to accommodate the utility services. Sizes depend on the engineers design.
Published: Mar.26, 2020 10:32:00
Author: Aisyaqilumar
Views: 2
Downloads: 0
File type: image / jpg
File size: 8.58 MB
Orginal size: 4000 x 2250 px
Available sizes:
S
(500 x 281)
M
(1000 x 563)
L
(2000 x 1125)
XL
(4000 x 2250)
EL0
(4000 x 2250)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image digging ditches for drainage.

Digging Ditches For Drainage.

3456 × 4308
stock image SELANGOR, MALAYSIA -AUGUST 2, 2021: Heavy-duty underground pipes lay in the ground at a construction site. this pipe will be the path to the high voltage electric cable.

SELANGOR, MALAYSIA -AUGUST 2, 2021: Heavy-duty Underground Pipes Lay In The Ground At A Construction Site. This Pipe Will Be The Path To The High Voltage Electric Cable.

3679 × 2759
stock image Casted pile cap at the construction site. It is part of the building foundation system. Protruded rebar is for the next stage of work.

Casted Pile Cap At The Construction Site. It Is Part Of The Building Foundation System. Protruded Rebar Is For The Next Stage Of Work.

4221 × 2816
stock image Underground utilities trenches under construction.

Underground Utilities Trenches Under Construction.

5152 × 3864
stock image KUALA LUMPUR, MALAYSIA -JULY 31, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipe joint and elbow in progress.

KUALA LUMPUR, MALAYSIA -JULY 31, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipe Joint And Elbow In Progress.

3502 × 2250
stock image SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

3786 × 2840
stock image repair broken pipe in hole with plumbing water flow underground

Repair Broken Pipe In Hole With Plumbing Water Flow Underground

5396 × 3597
stock image PENANG, MALAYSIA -SEPTEMBER 2, 2021: The process of cutting piles after the completion of building foundation piling work. This work needs to be done before the construction of the cap pile is carried out.

PENANG, MALAYSIA -SEPTEMBER 2, 2021: The Process Of Cutting Piles After The Completion Of Building Foundation Piling Work. This Work Needs To Be Done Before The Construction Of The Cap Pile Is Carried Out.

4822 × 3616