photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.

Stock image KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.
Published: Nov.08, 2018 15:43:20
Author: Aisyaqilumar
Views: 0
Downloads: 0
File type: image / jpg
File size: 6.71 MB
Orginal size: 3038 x 2279 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(3038 x 2279)
EL0
(3038 x 2279)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image JOHOR, MALAYSIA -JUNE 16, 2015: Excavated bore pile and ready to cut to designated level at the construction site. The bored pile must be cut before can fabricate the pile cap.

JOHOR, MALAYSIA -JUNE 16, 2015: Excavated Bore Pile And Ready To Cut To Designated Level At The Construction Site. The Bored Pile Must Be Cut Before Can Fabricate The Pile Cap.

3264 × 2448
stock image JOHOR, MALAYSIA -MARCH 28, 2015: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.

JOHOR, MALAYSIA -MARCH 28, 2015: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.

3968 × 2864
stock image JOHOR, MALAYSIA -MARCH 28, 2015: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.

JOHOR, MALAYSIA -MARCH 28, 2015: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.

3911 × 2900
stock image KUALA LUMPUR, MALAYSIA -JULY 16, 2016: Building foundation work at the construction site in Kuala Lumpur, Malaysia. Massive foundation for high rise building.

KUALA LUMPUR, MALAYSIA -JULY 16, 2016: Building Foundation Work At The Construction Site In Kuala Lumpur, Malaysia. Massive Foundation For High Rise Building.

2758 × 1872
stock image KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.

KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.

3788 × 2809
stock image KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.

KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.

3764 × 2940
stock image Underground utilities trenches under construction.

Underground Utilities Trenches Under Construction.

4538 × 3403
stock image PENANG, MALAYSIA -SEPTEMBER 2, 2021: The process of cutting piles after the completion of building foundation piling work. This work needs to be done before the construction of the cap pile is carried out.

PENANG, MALAYSIA -SEPTEMBER 2, 2021: The Process Of Cutting Piles After The Completion Of Building Foundation Piling Work. This Work Needs To Be Done Before The Construction Of The Cap Pile Is Carried Out.

3608 × 2706