Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated and cut to level bore pile at the construction site. Ready to construct pile cap reinforcement bar as next step of work.
Published:
Nov.08, 2018 15:43:20
Author:
Aisyaqilumar
Views:
0
Downloads:
0
File type:
image
/
jpg
File size:
6.71 MB
Orginal size:
3038
x
2279
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(3038 x 2279)
EL0
(3038 x 2279)
Level:
bronze
Download Image
Image topics:
Design
Risk
Steel
Cut
Speed
Accuracy
Building
Construction
Industry
Structure
Support
Measurement
Work
Drawing
Material
Foundation
Hole
Logistic
Safety
Cap
Engineering
Site
Team
Concrete
Level
Load
Pile
Workers
Reinforcement
Dig
Contractor
Platform
Housekeeping
Excavation
Cast
Pillar
Dimension
Calculation
Survey
Task
Civil
Reinforce
Install
Fabricate
Excavated
Form Work
Concrete Pile
Bore Pile
Similar stock images
JOHOR, MALAYSIA -JUNE 16, 2015: Excavated Bore Pile And Ready To Cut To Designated Level At The Construction Site. The Bored Pile Must Be Cut Before Can Fabricate The Pile Cap.
3264 × 2448
JOHOR, MALAYSIA -MARCH 28, 2015: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.
3968 × 2864
JOHOR, MALAYSIA -MARCH 28, 2015: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.
3911 × 2900
KUALA LUMPUR, MALAYSIA -JULY 16, 2016: Building Foundation Work At The Construction Site In Kuala Lumpur, Malaysia. Massive Foundation For High Rise Building.
2758 × 1872
KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.
3788 × 2809
KUALA LUMPUR, MALAYSIA -MARCH 28, 2016: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.
3764 × 2940
Underground Utilities Trenches Under Construction.
4538 × 3403
PENANG, MALAYSIA -SEPTEMBER 2, 2021: The Process Of Cutting Piles After The Completion Of Building Foundation Piling Work. This Work Needs To Be Done Before The Construction Of The Cap Pile Is Carried Out.
3608 × 2706