photo free
Home Images Vectors Videos

Stock image KUALA LUMPUR, MALAYSIA -May 16, 2017: Group of construction workers pouring wet concrete using the concrete hose from the concrete pump into the timber formwork at the construction site.

Stock image KUALA LUMPUR, MALAYSIA -May 16, 2017: Group of construction workers pouring wet concrete using the concrete hose from the concrete pump into the timber formwork at the construction site.
Published: Jan.13, 2020 10:13:38
Author: Aisyaqilumar
Views: 3
Downloads: 0
File type: image / jpg
File size: 10.87 MB
Orginal size: 4572 x 3429 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4572 x 3429)
EL0
(4572 x 3429)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image KUALA LUMPUR, MALAYSIA -May 16, 2017: Group of construction workers pouring wet concrete using the concrete hose from the concrete pump into the timber formwork at the construction site.

KUALA LUMPUR, MALAYSIA -May 16, 2017: Group Of Construction Workers Pouring Wet Concrete Using The Concrete Hose From The Concrete Pump Into The Timber Formwork At The Construction Site.

4598 × 3448
stock image KUALA LUMPUR, MALAYSIA -JANUARY 16, 2018: Construction workers pouring wet concrete using concrete spider hose into floor slab form work at the construction site.

KUALA LUMPUR, MALAYSIA -JANUARY 16, 2018: Construction Workers Pouring Wet Concrete Using Concrete Spider Hose Into Floor Slab Form Work At The Construction Site.

4645 × 3484
stock image KUALA LUMPUR, MALAYSIA -APRIL 27, 2017: Group of construction workers pouring wet concrete using the concrete hose from the concrete pump into the timber formwork at the construction site.

KUALA LUMPUR, MALAYSIA -APRIL 27, 2017: Group Of Construction Workers Pouring Wet Concrete Using The Concrete Hose From The Concrete Pump Into The Timber Formwork At The Construction Site.

4791 × 3593
stock image KUALA LUMPUR, MALAYSIA -JANUARY 16, 2018: Construction workers pouring wet concrete using concrete spider hose into floor slab form work at the construction site.

KUALA LUMPUR, MALAYSIA -JANUARY 16, 2018: Construction Workers Pouring Wet Concrete Using Concrete Spider Hose Into Floor Slab Form Work At The Construction Site.

4896 × 3672
stock image KUALA LUMPUR, MALAYSIA -APRIL 27, 2017: Group of construction workers pouring wet concrete using the concrete hose from the concrete pump into the timber formwork at the construction site.

KUALA LUMPUR, MALAYSIA -APRIL 27, 2017: Group Of Construction Workers Pouring Wet Concrete Using The Concrete Hose From The Concrete Pump Into The Timber Formwork At The Construction Site.

4538 × 3403
stock image KUALA LUMPUR, MALAYSIA -JANUARY 16, 2018: Construction workers pouring wet concrete using concrete spider hose into floor slab form work at the construction site.

KUALA LUMPUR, MALAYSIA -JANUARY 16, 2018: Construction Workers Pouring Wet Concrete Using Concrete Spider Hose Into Floor Slab Form Work At The Construction Site.

4896 × 3672
stock image KUALA LUMPUR, MALAYSIA -May 16, 2017: Group of construction workers pouring wet concrete using the concrete hose from the concrete pump into the timber formwork at the construction site.

KUALA LUMPUR, MALAYSIA -May 16, 2017: Group Of Construction Workers Pouring Wet Concrete Using The Concrete Hose From The Concrete Pump Into The Timber Formwork At The Construction Site.

4800 × 3600
stock image KUALA LUMPUR, MALAYSIA -DECEMBER 12, 2016: Wet concrete is allowed to harden in wooden form work as the mold. Timber form work will be dismantle after the concrete hardened.

KUALA LUMPUR, MALAYSIA -DECEMBER 12, 2016: Wet Concrete Is Allowed To Harden In Wooden Form Work As The Mold. Timber Form Work Will Be Dismantle After The Concrete Hardened.

4896 × 3672