Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also on going.
Published:
Oct.02, 2018 12:37:38
Author:
Aisyaqilumar
Views:
4
Downloads:
0
File type:
image
/
jpg
File size:
5.53 MB
Orginal size:
4000
x
2250
px
Available sizes:
S
(500 x 281)
M
(1000 x 563)
L
(2000 x 1125)
XL
(4000 x 2250)
EL0
(4000 x 2250)
Level:
bronze
Download Image
Image topics:
Perspective
Design
Space
Drop
Texture
Light
Board
Electrical
Industrial
Wire
Frame
Modern
Smoke
Architecture
Building
Construction
Office
Lamp
Interior
Tile
Services
Panel
Work
Fixture
Room
Hang
Fluorescent
Material
Grid
Under
Site
Level
Pipe
Worker
Fitting
Mechanical
Ceiling
Gypsum
Installation
Pane
Slab
Sprinkler
Detector
Install
Duct
Suspended
Ventilation
Hung
Plasterboard
Air Condition
Similar stock images
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
4000 × 2250
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
4000 × 2250
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
3628 × 2041
KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air-condition And Ventilation Duct Installed By Construction Workers At The Construction Site. Distribute Cool Air And Control The Temperature.
3898 × 2250
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
3912 × 2934
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
4000 × 2250
Building Finishing Work
2900 × 2175
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
3204 × 2014