Home
Images
Vectors
Videos
Stock image MALACCA, MALAYSIA -DECEMBER 07, 2016: Construction activity by construction workers for foundation work inside the sheet pile cofferdam retaining wall area.
Published:
Jan.14, 2021 16:23:55
Author:
Aisyaqilumar
Views:
0
Downloads:
0
File type:
image
/
jpg
File size:
9.64 MB
Orginal size:
4096
x
3037
px
Available sizes:
S
(500 x 371)
M
(1000 x 741)
L
(2000 x 1483)
XL
(4096 x 3037)
EL0
(4096 x 3037)
Level:
bronze
Download Image
Image topics:
Activity
Design
Business
Equipment
Metal
Outdoor
Vertical
Transportation
Steel
Plate
Technology
Machine
Heavy
Architecture
Building
Construction
Industry
Structure
Wall
Strong
Support
Work
Inside
Material
Foundation
Safety
Rust
Protect
Soil
Iron
Sheet
Engineering
Site
Outside
Area
Concrete
Worker
Pile
Reinforcement
Bored
Allow
Force
Excavation
Compound
Labour
Piling
Temporary
Pits
Retaining
Cofferdam
Similar stock images
KUALA LUMPUR, SEPTEMBER 17, 2015: Building Ground Beam Reinforcement Bar And Formwork Fabricated At The Site By Construction Workers. Concrete Will Be Poured Into It After Satisfied By The Engineer.
3863 × 2865
MALACCA, MALAYSIA -DECEMBER 07, 2016: Construction Activity By Construction Workers For Foundation Work Inside The Sheet Pile Cofferdam Retaining Wall Area.
3753 × 2782
MALACCA, MALAYSIA -AUGUST 22, 2017: Fabrication Work Of Building Beam Formwork And Reinforcement Bar At The Construction Site In Malacca, Malaysia.
4208 × 3120
JOHOR, MALAYSIA -MARCH 29, 2016: Construction Workers Spraying The Anti Termite Chemical Treatment To The Soil At The Construction Site.
2552 × 1915
KUALA LUMPUR, MALAYSIA -JUNE 13, 2016: Construction Site In Progress Malaysia During Daytime. Daily Activity Is Ongoing.
4896 × 3272
KUALA LUMPUR, MALAYSIA - SEPTEMBER 15, 2016: Building Foundation Work At Construction Site. Work Below The Surface Is The Construction Ongoing Work
3980 × 2951
KUALA LUMPUR, MALAYSIA -AUGUST 07, 2017: Timber Formwork Commonly Made From Plywood And Timber At The Construction Site. Formwork Used As A Mold For The Reinforcement Concrete.
3531 × 2619
Sheet Pile Cofferdam Retaining Wall At The Construction Site. It Is Installed To Allow Soil Excavation And Foundation Work Start.
4106 × 3045