photo free
Home Images Vectors Videos

Stock image MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) opened in 1962 the structure was degraded by de-icing salt.Demolition began in 2020. It will take 4 years, and may cost about $400 M

Stock image MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) opened in 1962 the structure was degraded by de-icing salt.Demolition began in 2020. It will take 4 years, and may cost about $400 M
Published: Aug.17, 2021 14:22:41
Author: meunierd
Views: 1
Downloads: 0
File type: image / jpg
File size: 11.58 MB
Orginal size: 5472 x 3648 px
Available sizes:
S
(500 x 333)
M
(1000 x 667)
L
(2000 x 1333)
XL
(5472 x 3648)
EL0
(5472 x 3648)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) opened in 1962 the structure was degraded by de-icing salt.Demolition began in 2020. It will take 4 years, and may cost about $400 M

MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) Opened In 1962 The Structure Was Degraded By De-icing Salt.Demolition Began In 2020. It Will Take 4 Years, And May Cost About $400 M

5472 × 3648
stock image MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) opened in 1962 the structure was degraded by de-icing salt.Demolition began in 2020. It will take 4 years, and may cost about $400 M

MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) Opened In 1962 The Structure Was Degraded By De-icing Salt.Demolition Began In 2020. It Will Take 4 Years, And May Cost About $400 M

5288 × 3525
stock image Montreal, Canada - 19 September 2019: New Champlain bridge next to Old Champlain Bridge from Estacade Bike Path.

Montreal, Canada - 19 September 2019: New Champlain Bridge Next To Old Champlain Bridge From Estacade Bike Path.

4928 × 3280
stock image Montreal, Canada - 19 September 2019: New Champlain bridge next to Old Champlain Bridge from Petite Voie du Fleuve.

Montreal, Canada - 19 September 2019: New Champlain Bridge Next To Old Champlain Bridge From Petite Voie Du Fleuve.

4928 × 3280
stock image MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) opened in 1962 the structure was degraded by de-icing salt.Demolition began in 2020. It will take 4 years, and may cost about $400 M

MONTREAL CANADA - 08 04 2021: Champlain Bridge (Montreal, 19622019) Opened In 1962 The Structure Was Degraded By De-icing Salt.Demolition Began In 2020. It Will Take 4 Years, And May Cost About $400 M

5472 × 2054
stock image MONTREAL CANADA - 10 24 2022: Samuel De Champlain Bridge an a part of the old bridge is a cable stayed bridge design by architect Poul Ove Jensen and built to replace the original Champlain Bridge

MONTREAL CANADA - 10 24 2022: Samuel De Champlain Bridge An A Part Of The Old Bridge Is A Cable Stayed Bridge Design By Architect Poul Ove Jensen And Built To Replace The Original Champlain Bridge

5472 × 2651
stock image MONTREAL CANADA - 10 24 2022: Samuel De Champlain Bridge an a part of the old bridge is a cable stayed bridge design by architect Poul Ove Jensen and built to replace the original Champlain Bridge

MONTREAL CANADA - 10 24 2022: Samuel De Champlain Bridge An A Part Of The Old Bridge Is A Cable Stayed Bridge Design By Architect Poul Ove Jensen And Built To Replace The Original Champlain Bridge

5373 × 3648
stock image A bridge over the lake against the blue sky

A Bridge Over The Lake Against The Blue Sky

4080 × 3072