photo free
Home Images Vectors Videos

Stock image PENANG, MALAYSIA -JANUARY 5, 2021: Sewerage pipes from the toilet above are interconnected under the floor soffit. Installed in gradient and gravity flow. Channeled to the main sewer line.

Stock image PENANG, MALAYSIA -JANUARY 5, 2021: Sewerage pipes from the toilet above are interconnected under the floor soffit. Installed in gradient and gravity flow. Channeled to the main sewer line.
Published: Jan.05, 2022 15:46:33
Author: Aisyaqilumar
Views: 2
Downloads: 0
File type: image / jpg
File size: 27.56 MB
Orginal size: 7941 x 5963 px
Available sizes:
S
(500 x 375)
M
(1000 x 751)
L
(2000 x 1502)
XL
(7941 x 5963)
EL0
(7941 x 5963)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image KUALA LUMPUR, MALAYSIA - JULY 16, 2018: Air-condition and ventilation duct installed by construction workers  at the construction site. Distributing cool air and control the rooms temperature.

KUALA LUMPUR, MALAYSIA - JULY 16, 2018: Air-condition And Ventilation Duct Installed By Construction Workers At The Construction Site. Distributing Cool Air And Control The Rooms Temperature.

4000 × 3000
stock image KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation of airconditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.

KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Airconditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.

4000 × 3000
stock image KUALA LUMPUR, MALAYSIA - SEPTEMBER 01, 2018: Air condition duct and other services above ceiling level coordinated and installed by construction workers  at the construction site

KUALA LUMPUR, MALAYSIA - SEPTEMBER 01, 2018: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site

4448 × 3336
stock image KUALA LUMPUR, MALAYSIA - JULY 16, 2018: Air-condition and ventilation duct installed by construction workers  at the construction site. Distributing cool air and control the rooms temperature.

KUALA LUMPUR, MALAYSIA - JULY 16, 2018: Air-condition And Ventilation Duct Installed By Construction Workers At The Construction Site. Distributing Cool Air And Control The Rooms Temperature.

3604 × 2703
stock image KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation of air conditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.

KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.

4660 × 3495
stock image KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air condition duct and other services above ceiling level coordinated and installed by construction workers  at the construction site

KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site

4163 × 3122
stock image KUALA LUMPUR, MALAYSIA - SEPTEMBER 01, 2018: Air condition duct and other services above ceiling level coordinated and installed by construction workers  at the construction site

KUALA LUMPUR, MALAYSIA - SEPTEMBER 01, 2018: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site

4672 × 3504
stock image KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation of airconditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.

KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Airconditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.

4477 × 3358