photo free
Home Images Vectors Videos

Stock image Pile cap and column stump under construction at the construction site. Constructed using reinforced concrete with plywood timber as formwork.

Stock image Pile cap and column stump under construction at the construction site. Constructed using reinforced concrete with plywood timber as formwork.
Published: Dec.28, 2019 13:18:59
Author: Aisyaqilumar
Views: 1
Downloads: 0
File type: image / jpg
File size: 5.81 MB
Orginal size: 3735 x 2312 px
Available sizes:
S
(500 x 310)
M
(1000 x 619)
L
(2000 x 1238)
XL
(3735 x 2312)
EL0
(3735 x 2312)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image SEREMBAN, MALAYSIA -MARCH 02, 2020:  Bore pile cut to level by the construction workers. Next stage is fabricating the pile cap's reinforcement bar and formworks.

SEREMBAN, MALAYSIA -MARCH 02, 2020: Bore Pile Cut To Level By The Construction Workers. Next Stage Is Fabricating The Pile Cap's Reinforcement Bar And Formworks.

4045 × 2274
stock image KUALA LUMPUR, MALAYSIA -JUNE 29, 2018: Sub-structure foundation works at the construction site. Constructed by workers with help by heavy machinery

KUALA LUMPUR, MALAYSIA -JUNE 29, 2018: Sub-structure Foundation Works At The Construction Site. Constructed By Workers With Help By Heavy Machinery

3951 × 2964
stock image PENANG, MALAYSIA -SEPTEMBER 2, 2021: The process of cutting piles after the completion of building foundation piling work. This work needs to be done before the construction of the cap pile is carried out.

PENANG, MALAYSIA -SEPTEMBER 2, 2021: The Process Of Cutting Piles After The Completion Of Building Foundation Piling Work. This Work Needs To Be Done Before The Construction Of The Cap Pile Is Carried Out.

4733 × 3550
stock image SERDANG, MALAYSIA -APRIL 5, 2018: Building ground beam under construction. Made from steel reinforced concrete and the mould made from timber and plywood. Constructed by workers.

SERDANG, MALAYSIA -APRIL 5, 2018: Building Ground Beam Under Construction. Made From Steel Reinforced Concrete And The Mould Made From Timber And Plywood. Constructed By Workers.

3740 × 2104
stock image SELANGOR, MALAYSIA -MAY 13, 2016: Hot rolled deformed steel bars or steel reinforcement bar at the construction site. It uses to strengthen concrete. It is shaped to follow the engineer design.

SELANGOR, MALAYSIA -MAY 13, 2016: Hot Rolled Deformed Steel Bars Or Steel Reinforcement Bar At The Construction Site. It Uses To Strengthen Concrete. It Is Shaped To Follow The Engineer Design.

4208 × 3120
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 6, 2019: Casted pile cap at the construction site. It is part of the building foundation system. Protruded rebar is for the next stage of work.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 6, 2019: Casted Pile Cap At The Construction Site. It Is Part Of The Building Foundation System. Protruded Rebar Is For The Next Stage Of Work.

4121 × 2750
stock image SELANGOR, MALAYSIA -JULY 4, 2021: The concrete pile cap and column stump are under construction at the construction site. Both are part of the building's foundation system.

SELANGOR, MALAYSIA -JULY 4, 2021: The Concrete Pile Cap And Column Stump Are Under Construction At The Construction Site. Both Are Part Of The Building's Foundation System.

4597 × 3448
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 6, 2019: Pile cap and column stump under construction at the construction site. Constructed using reinforced concrete with plywood timber as a form work.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 6, 2019: Pile Cap And Column Stump Under Construction At The Construction Site. Constructed Using Reinforced Concrete With Plywood Timber As A Form Work.

8000 × 6000