Home
Images
Vectors
Videos
Stock image Pre-stress cable laid in round ducting and install in between the slab steel reinforcement bar at the construction site.
Published:
Dec.26, 2018 15:58:36
Author:
Aisyaqilumar
Views:
12
Downloads:
0
File type:
image
/
jpg
File size:
11.11 MB
Orginal size:
4896
x
3672
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4896 x 3672)
EL0
(4896 x 3672)
Level:
bronze
Download Image
Image topics:
Large
Round
Design
Equipment
Push
Head
Steel
Cable
Connection
Technology
Machine
Architecture
Construction
Structure
Inside
Material
Floor
Alloy
Quality
Engineering
Conceal
Concrete
Pipe
Workers
Reinforcement
Engineer
Spend
Contractor
Pull
Force
Anchor
Hydraulic
Pump
Slab
Tendon
Span
Civil
Specialist
Overhang
Grout
Duct
Embedded
Spacing
Construction Site
Civil Engineering
Fill In
Civil Engineer
Pre Stress
Similar stock images
MALACCA, MALAYSIA -APRIL 14, 2016: Pre-stress Cable Laid In Round Ducting Install In Between The Slab Steel Reinforcement Bar At The Construction Site.
4996 × 3768
KUALA LUMPUR, MALAYSIA -FEBRUARY 16, 2018: Steel Reinforcement Bar And Timber Formworks At The Construction Site. Be Part Of The Reinforced Concrete Structure. It Is Tied Together Using Tiny Wire Before Pouring The Concrete.
4566 × 3424
SELANGOR, MALAYSIA -MAY 18, 2016: Hot Rolled Deformed Steel Bars Or Steel Reinforcement Bar Tied Together Before Casting In The Concrete. Its Function Is To Increase The Concrete Strength.
2357 × 3521
SELANGOR, MALAYSIA -MAY 13, 2016: Steel Reinforcement Bar At The Construction Site To Form The Steel-reinforced Concrete Slab. It Uses To Strengthen The Concrete. It Is Shaped To Follow The Engineer's Design.
3168 × 2136
Hot-rolled Deformed Steel Bars Or Steel Reinforcement Bar Tied Together Before Casting In The Concrete. Its Function Is To Increase The Concrete Strength.
5152 × 3864
Reinforcement Metal Framework For Concrete Pouring. Ready For Filling Up With Concrete.
2592 × 1944
Construction Site
4288 × 2848
Close Up View Of Reinforcement Of Concrete With Metal Rods Connected By Wire. Preparation For Pouring The Foundation
2800 × 4200