Home
Images
Vectors
Videos
Stock image Resumption of work at line 6 orange metro. October 6, 2020, Sao Paulo, Brazil: The Governor of Sao Paulo, Joao Doria Jr. participates in the resumption of work on Line-6 Orange Metro, which will have 15.3 km and 15 stations
Published:
Jun.07, 2021 13:39:56
Author:
thenews2.com
Views:
1
Downloads:
0
File type:
image
/
jpg
File size:
0.75 MB
Orginal size:
3000
x
2008
px
Available sizes:
S
(500 x 335)
M
(1000 x 669)
L
(2000 x 1339)
XL
(3000 x 2008)
EL0
(3000 x 2008)
Level:
bronze
Download Image
Image topics:
Blue
Background
View
Stone
Travel
Outdoors
Nature
Outdoor
Texture
Orange
Natural
Wooden
October
Industrial
Line
Old
River
Bridge
Landscape
Architecture
Building
Construction
Industry
Wall
Work
Wood
Material
Rock
Tourism
Km
Concrete
Have
Metro
Will
Brazil
Dam
15
Which
Stations
2020
Governor
Sao
Joao
Paulo
JR
Resumption
Doria
Participates
Similar stock images
Industrial Photography. Closed Locks Of Zeya Hydroelectric Power Station Against The Background Of Calm Blue Water.
5385 × 3590
Thessaloniki, Greece - May 23, 2020: Construction Of Metro In The Center Of Town In Thessaloniki
5472 × 3648
Subway Tunnel. Kiev, Ukraine. Kyiv, Ukraine
3611 × 2461
Tunnel Boring
7198 × 4804
Tunnel Construction
2800 × 1994
Photo Of The Undeground Parking Industrial Construction Site.
5999 × 3999
At A Wastewater Treatment Plan In Usa
6244 × 4163
Photo Of The Undeground Parking Industrial Construction Site.
5999 × 3999