Home
Images
Vectors
Videos
Stock image SELANGOR, MALAYSIA -AUGUST 2, 2021: Heavy-duty underground pipes lay in the ground at a construction site. this pipe will be the path to the high voltage electric cable.
Published:
Aug.02, 2022 07:31:53
Author:
Aisyaqilumar
Views:
1
Downloads:
0
File type:
image
/
jpg
File size:
11.75 MB
Orginal size:
2932
x
3910
px
Available sizes:
S
(375 x 500)
M
(750 x 1000)
L
(1500 x 2000)
XL
(2932 x 3910)
EL0
(2932 x 3910)
Level:
bronze
Download Image
Image topics:
Red
High
Path
Equipment
Outdoor
Energy
Cable
Connection
Electric
Electrical
Electricity
Industrial
Plastic
Power
Supply
Technology
Voltage
Stack
Line
Construction
Industry
Lay
Connect
Network
Work
Tube
Earth
Material
Route
Soil
Repair
Engineering
Site
Ground
Infrastructure
Pipe
Worker
Tubing
Pipeline
Drain
Underground
Machinery
Excavation
Manhole
Networks
Heavy Duty
Piping
Install
Trench
Pvc
Similar stock images
SELANGOR, MALAYSIA -AUGUST 2, 2021: Heavy-duty Underground Pipes Lay In The Ground At A Construction Site. This Pipe Will Be The Path To The High Voltage Electric Cable.
2826 × 3768
SELANGOR, MALAYSIA -AUGUST 2, 2021: Heavy-duty Underground Pipes Lay In The Ground At A Construction Site. This Pipe Will Be The Path To The High Voltage Electric Cable.
2670 × 3560
SEREMBAN, MALAYSIA -AUGUST 6, 2020: Utility Services Manhole And Underground Pipes Under Construction At The Construction Site. In-situ Construction By Workers Based On Infrastructure Engineer Design.
3741 × 2806
SEREMBAN, MALAYSIA -AUGUST 6, 2020: Utility Services Manhole And Underground Pipes Under Construction At The Construction Site. In-situ Construction By Workers Based On Infrastructure Engineer Design.
3767 × 2825
SEREMBAN, MALAYSIA -AUGUST 6, 2020: Utility Services Manhole And Underground Pipes Under Construction At The Construction Site. In-situ Construction By Workers Based On Infrastructure Engineer Design.
3601 × 2701
SEREMBAN, MALAYSIA -AUGUST 6, 2020: Utility Services Manhole And Underground Pipes Under Construction At The Construction Site. In-situ Construction By Workers Based On Infrastructure Engineer Design.
3856 × 2892
PENANG, MALAYSIA -SEPTEMBER 2, 2021: The Process Of Cutting Piles After The Completion Of Building Foundation Piling Work. This Work Needs To Be Done Before The Construction Of The Cap Pile Is Carried Out.
4650 × 3487
Utility Services Manhole Under Construction At The Construction Site. In-situ Construction By Workers Based On Infrastructure Engineer Design.
3819 × 2865