photo free
Home Images Vectors Videos

Stock image SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

Stock image SEREMBAN, MALAYSIA -AUGUST 01, 2019: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.
Published: Jun.15, 2020 13:05:33
Author: Aisyaqilumar
Views: 1
Downloads: 1
File type: image / jpg
File size: 10.32 MB
Orginal size: 4000 x 3000 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4000 x 3000)
EL0
(4000 x 3000)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

4000 × 3000
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

3825 × 2868
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

3671 × 2753
stock image KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of stop cork valve and joint in progress.

KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Stop Cork Valve And Joint In Progress.

3777 × 2833
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of pipes still ongoing.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 12, 2018: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Pipes Still Ongoing.

3682 × 2250
stock image  Underground utility and services pipe

Underground Utility And Services Pipe

4812 × 2997
stock image KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground utility and services pipe laid by workers in the trenches at the construction site. Installation of stop cork valve and joint in progress.

KUALA LUMPUR, MALAYSIA -JUNE 02, 2017: Underground Utility And Services Pipe Laid By Workers In The Trenches At The Construction Site. Installation Of Stop Cork Valve And Joint In Progress.

3661 × 2746
stock image JOHOR, MALAYSIA -MARCH 02, 2017: Underground utility and services pipe lay by workers at the construction site. The pipes used to protect cable lay inside it.

JOHOR, MALAYSIA -MARCH 02, 2017: Underground Utility And Services Pipe Lay By Workers At The Construction Site. The Pipes Used To Protect Cable Lay Inside It.

5328 × 2997