Home
Images
Vectors
Videos
Stock image SEREMBAN, MALAYSIA -AUGUST 2016: Building foundation work at the construction site. Heavy construction work.
Published:
Apr.27, 2021 07:04:22
Author:
Aisyaqilumar
Views:
0
Downloads:
0
File type:
image
/
jpg
File size:
7.48 MB
Orginal size:
3743
x
2775
px
Available sizes:
S
(500 x 371)
M
(1000 x 741)
L
(2000 x 1483)
XL
(3743 x 2775)
EL0
(3743 x 2775)
Level:
bronze
Download Image
Image topics:
Object
Design
Equipment
Metal
Steel
Industrial
Cut
Heavy
Architecture
Building
Construction
House
Industry
Structure
Moving
Work
Earth
Project
Cement
Material
Foundation
Hole
Plywood
Truck
Safety
Sand
Beam
Sheet
Engineering
Site
Area
Ground
Concrete
Residential
Worker
Load
Pile
Dig
Underground
Excavation
Digger
Excavator
Malaysia
Bore
Piling
Backhoe
Fabricate
Reinforced
Retaining
Form Work
Similar stock images
SELANGOR, MALAYSIA - JANUARY 15, 2017: Foundation Work Include The Building Piling Works And Pile Cap Construction At The Construction Site. Heavy Construction Work With Full Awareness About Workers Safety.
3733 × 2768
JOHOR, MALAYSIA -MARCH 28, 2015: Excavated And Cut To Level Bore Pile At The Construction Site. Ready To Construct Pile Cap Reinforcement Bar As Next Step Of Work.
4032 × 2989
JOHOR, MALAYSIA -JUNE 16, 2015: Excavated Bore Pile And Ready To Cut To Designated Level At The Construction Site. The Bored Pile Must Be Cut Before Can Fabricate The Pile Cap.
4208 × 3120
Sheet Pile Cofferdam Retaining Wall At The Construction Site. It Is Installed To Allow Soil Excavation And Foundation Work Start.
3933 × 2916
SEREMBAN, MALAYSIA -AUGUST 2016: Building Foundation Work At The Construction Site. Heavy Construction Work.
3620 × 2684
SEREMBAN, MALAYSIA -AUGUST 2016: Building Foundation Work At The Construction Site. Heavy Construction Work.
3136 × 1872
Temporary Steel Sheet Retaining Wall Using Sheet Pile Cofferdam Method
4208 × 3120
JOHOR, MALAYSIA -JUNE 16, 2015: Excavated Bore Pile And Ready To Cut To Designated Level At The Construction Site. The Bored Pile Must Be Cut Before Can Fabricate The Pile Cap.
4208 × 3120