Home
Images
Vectors
Videos
Stock image Two working drillers in a uniform, in a helmet and goggles, install drill pipes after lifting them from an oil well after drilling. The concept of a working person
Published:
Nov.12, 2020 11:07:09
Author:
AlekseiZakirov
Views:
15
Downloads:
0
File type:
image
/
jpg
File size:
15.74 MB
Orginal size:
6000
x
4000
px
Available sizes:
S
(500 x 333)
M
(1000 x 667)
L
(2000 x 1333)
XL
(6000 x 4000)
EL0
(6000 x 4000)
Level:
beginner
Download Image
Image topics:
Equipment
Metal
Field
Oil
Steel
Man
Industrial
Power
Technology
Industry
Working
Route
Production
Engineering
Lift
Glasses
Pipe
Mechanic
Worker
Drill
Gas
Drilling
Hose
Technological
Well
Platform
Machinery
Mud
Rotary
Mining
Elevator
Petroleum
Operation
Rig
Hydraulics
Derrick
Offshore
Driller
Oilman
Oilrig
Borehole
Roughneck
Hard Hat
Oil Industry
Working Clothes
Drilling Rig
Drillpipes
Spinning Wrench
Drill A Well
Similar stock images
Two Working Drillers In A Uniform, In A Helmet And Goggles, Install Drill Pipes After Lifting Them From An Oil Well After Drilling. The Concept Of A Working Person
6000 × 4000
Two Working Drillers In A Uniform, In A Helmet And Goggles, Install Drill Pipes After Lifting Them From An Oil Well After Drilling. The Concept Of A Working Person
6000 × 4000
Two Working Drillers In A Uniform, In A Helmet And Goggles, Install Drill Pipes After Lifting Them From An Oil Well After Drilling. The Concept Of A Working Person
6000 × 4000
Two Working Drillers In A Uniform, In A Helmet And Goggles, Install Drill Pipes After Lifting Them From An Oil Well After Drilling. The Concept Of A Working Person
6000 × 4000
Two Working Drillers In A Uniform, In A Helmet And Goggles, Install Drill Pipes After Lifting Them From An Oil Well After Drilling. The Concept Of A Working Person
6000 × 4000
Irkutsk, Russia - March 24, 2017: Workers Work On Pipeline Operations. Pipe Penetration.
2500 × 1667
Offshore Oil Rig Worker Prepare Tool And Equipment For Perforation Oil And Gas Well At Wellhead Platform. Making Up A Drill Pipe Connection. A View For Drill Pipe Connection From Between The Stands.
4911 × 3275
Workover Rig Working On A Previously Drilled Well Trying To Restore Production Through Repair. Toned.
6000 × 4000