Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air condition duct and other services above ceiling level coordinated and installed by construction workers at the construction site
Published:
Sep.25, 2018 11:29:17
Author:
Aisyaqilumar
Views:
0
Downloads:
0
File type:
image
/
jpg
File size:
9.46 MB
Orginal size:
4896
x
3672
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4896 x 3672)
EL0
(4896 x 3672)
Level:
bronze
Download Image
Image topics:
Horizontal
Design
Metal
Silver
Water
Air
Steel
Protection
Electrical
Industrial
Cold
Cool
Flow
Construction
Cross
Services
Work
Heat
Conditioner
Route
System
Site
Level
Pipe
Worker
Height
Condition
Mechanical
Cooling
Ceiling
Hanger
Return
Outgoing
Conditioning
Install
Duct
Insulation
Ventilation
Conduit
Incoming
Units
Coordinate
Ducting
Ductwork
Chiller
Soffit
Hvac
Trunking
Fire Fighting
Air Conditioner
Similar stock images
KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site
4472 × 3354
KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Airconditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.
3941 × 2956
KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Airconditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.
4800 × 3600
KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site
4163 × 3122
KUALA LUMPUR, MALAYSIA - SEPTEMBER 01, 2018: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site
4448 × 3336
KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site
4320 × 3240
KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.
4637 × 3478
KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air Condition Duct And Other Services Above Ceiling Level Coordinated And Installed By Construction Workers At The Construction Site
4677 × 3508