Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -AUGUST 7, 2017: Installation of air conditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.
Published:
Aug.13, 2018 07:09:09
Author:
Aisyaqilumar
Views:
3
Downloads:
0
File type:
image
/
jpg
File size:
9.03 MB
Orginal size:
4662
x
3496
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4662 x 3496)
EL0
(4662 x 3496)
Level:
bronze
Download Image
Image topics:
Horizontal
Design
Metal
Silver
Air
Steel
Handle
Industrial
Technology
Modern
Cold
Flow
Building
Construction
Industry
Services
Work
Heat
Part
Conditioner
Hang
Temperature
Route
Safety
System
Engineering
Site
Pipe
Height
Condition
Mechanical
Cooling
Ceiling
Insulated
Slab
Hanger
Conditioning
Duct
Insulation
Ventilation
Fabricate
Vent
Units
Ducting
Ductwork
Chiller
Soffit
Hvac
Air Conditioner
Concrete Slab
Similar stock images
KUALA LUMPUR, MALAYSIA - AUGUST 31, 2019: Air-condition And Ventilation Duct Under Construction At The Construction Site. Distributing Cool Air And Control The Room's Temperature.
4329 × 3247
KUALA LUMPUR, MALAYSIA - AUGUST 31, 2018: Air-condition And Ventilation Duct Under Construction At The Construction Site. Distributing Cool Air And Control The Room's Temperature.
4896 × 3672
KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.
4706 × 3529
KUALA LUMPUR, MALAYSIA -AUGUST 7, 2017: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.
4310 × 3233
KUALA LUMPUR, MALAYSIA - SEPTEMBER 16, 2017: Air-condition And Ventilation Duct Installed By Construction Workers At The Construction Site. Distribute Cool Air And Control The Temperature.
3898 × 2250
KUALA LUMPUR, MALAYSIA -AUGUST 7, 2017: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.
4362 × 3272
KUALA LUMPUR, MALAYSIA -JULY 24 2020: The Suspended Ceiling, Electrical Wiring, Cabling And Mechanical Equipment Under Installation. It Is Hanging At The Floor Soffit. Cover By Ceiling Board.
4515 × 3390
Man Assembles Profile Metal Frame For Plasterboard Ceilings. High Quality Photo
6000 × 4000