Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC sewerage pipe below toilet's soffit under construction at the construction site. The pipes connected together and channels to the main sewer.
Published:
Sep.30, 2019 08:11:04
Author:
Aisyaqilumar
Views:
3
Downloads:
0
File type:
image
/
jpg
File size:
8.26 MB
Orginal size:
4164
x
3123
px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(4164 x 3123)
EL0
(4164 x 3123)
Level:
bronze
Download Image
Image topics:
Horizontal
Design
Equipment
Metal
Steel
Handle
Industrial
Plastic
Technology
Modern
Cold
Flow
Building
Construction
Industry
Connect
Services
Work
Part
Conditioner
Waste
Route
Safety
System
Engineering
Site
Pipe
Worker
Height
Toilet
Mechanical
Cooling
Channel
Ceiling
Insulated
Fix
Slab
Hanger
Sewer
Return
Duct
Fabricate
Hung
Vent
Units
Sewerage
Ducting
Ductwork
Soffit
Poly
Similar stock images
KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC Sewerage Pipe Below Toilet's Soffit Under Construction At The Construction Site. The Pipes Connected Together And Channels To The Main Sewer.
4057 × 3042
KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC Sewerage Pipe Below Toilet's Soffit Under Construction At The Construction Site. The Pipes Connected Together And Channels To The Main Sewer.
4131 × 3098
IPOH, MALAYSIA -JANUARY 2, 2021: Sewerage Pipes Form Toilet Above Are Interconnected Under The Floor Soffit. Installed In Gradient And Gravity Flow. Channeled To The Main Sewer Line.
3403 × 2552
KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC Sewerage Pipe Below Toilet's Soffit Under Construction At The Construction Site. The Pipes Connected Together And Channels To The Main Sewer.
4326 × 3244
PENANG, MALAYSIA -JANUARY 5, 2021: Sewerage Pipes From The Toilet Above Are Interconnected Under The Floor Soffit. Installed In Gradient And Gravity Flow. Channeled To The Main Sewer Line.
9248 × 6944
KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC Sewerage Pipe Below Toilet's Soffit Under Construction At The Construction Site. The Pipes Connected Together And Channels To The Main Sewer.
4362 × 3272
KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC Sewerage Pipe Below Toilet's Soffit Under Construction At The Construction Site. The Pipes Connected Together And Channels To The Main Sewer.
4518 × 3389
KUALA LUMPUR, MALAYSIA -JANUARY 15, 2018: UPVC Sewerage Pipe Below Toilet's Soffit Under Construction At The Construction Site. The Pipes Connected Together And Channels To The Main Sewer.
4369 × 3276