Home
Images
Vectors
Videos
Stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also on going.
Published:
Oct.02, 2018 12:37:38
Author:
Aisyaqilumar
Views:
2
Downloads:
0
File type:
image
/
jpg
File size:
5.51 MB
Orginal size:
3772
x
2250
px
Available sizes:
S
(500 x 298)
M
(1000 x 597)
L
(2000 x 1193)
XL
(3772 x 2250)
EL0
(3772 x 2250)
Level:
bronze
Download Image
Image topics:
Perspective
Design
Space
Drop
Texture
Light
Board
Electrical
Industrial
Wire
Frame
Modern
Smoke
Architecture
Building
Construction
Office
Lamp
Interior
Tile
Services
Panel
Work
Fixture
Room
Hang
Fluorescent
Material
Grid
Under
Site
Level
Pipe
Worker
Fitting
Mechanical
Ceiling
Gypsum
Installation
Pane
Slab
Sprinkler
Detector
Install
Duct
Suspended
Ventilation
Hung
Plasterboard
Air Condition
Similar stock images
SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also Ongoing.
3752 × 2814
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
4000 × 3000
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
3801 × 2850
Macro Grid False Ceiling Around Gypsum Finished Under Progress Which Expose Pink Gypsum Board Furring Channels Supports And Threaded Rod
4032 × 3024
SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also Ongoing.
3316 × 2487
Macro Grid False Ceiling Around Gypsum Finished Under Progress Which Expose Pink Gypsum Board Furring Channels Supports And Threaded Rod
4032 × 3024
KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.
4456 × 3342
SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also Ongoing.
3689 × 2766