photo free
Home Images Vectors Videos

Stock image SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also ongoing.

Stock image SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also ongoing.
Published: Apr.06, 2020 07:08:03
Author: Aisyaqilumar
Views: 1
Downloads: 0
File type: image / jpg
File size: 5.12 MB
Orginal size: 3752 x 2814 px
Available sizes:
S
(500 x 375)
M
(1000 x 750)
L
(2000 x 1500)
XL
(3752 x 2814)
EL0
(3752 x 2814)
Level: bronze
Download Image
Image topics:

Similar stock images

stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also on going.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.

3772 × 2250
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also on going.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.

3801 × 2850
stock image KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also on going.

KUALA LUMPUR, MALAYSIA -SEPTEMBER 26, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also On Going.

4000 × 3000
stock image SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended ceiling frame and board under construction at the construction site. Electrical and mechanical fitting installation work also ongoing.

SEREMBAN, MALAYSIA -APRIL 25, 2018: Suspended Ceiling Frame And Board Under Construction At The Construction Site. Electrical And Mechanical Fitting Installation Work Also Ongoing.

3592 × 2694
stock image KUALA LUMPUR, MALAYSIA -AUGUST 7, 2017: Installation of air conditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.

KUALA LUMPUR, MALAYSIA -AUGUST 7, 2017: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.

4604 × 3453
stock image Macro Grid False ceiling around gypsum finished under progress which expose pink gypsum board furring channels supports and threaded rod

Macro Grid False Ceiling Around Gypsum Finished Under Progress Which Expose Pink Gypsum Board Furring Channels Supports And Threaded Rod

4032 × 3024
stock image KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation of air conditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.

KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.

3692 × 2769
stock image KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation of air conditioner ducting and chiller pipes system and hung it at the concrete slab. Installed and coordinated together with other services.

KUALA LUMPUR, MALAYSIA -APRIL 7, 2018: Installation Of Air Conditioner Ducting And Chiller Pipes System And Hung It At The Concrete Slab. Installed And Coordinated Together With Other Services.

4000 × 3000